In the solution design stage of an automation project, the outputs are critical for ensuring that the implementation phase flows smoothly and that all stakeholders are aligned with the design direction. The correct answer includes the deployment plan, the approved software design document (SDD), and a technical testing plan.

The deployment plan outlines how the automation will be rolled out and integrated into the existing environment, detailing the necessary steps, resources, and timeframes required for successful deployment. This careful planning is essential for mitigating risks and ensuring that all operational aspects are considered before the system goes live.

The approved SDD is a crucial document that captures all the design decisions and architecture of the solution. It serves as a reference for developers, testers, and other stakeholders throughout the project, ensuring that everyone has a shared understanding of the solution's structure and functionality. Obtaining approval for this document indicates stakeholder buy-in, ensuring that the project moves forward with clear expectations.

Finally, the technical testing plan outlines the approach for validating the automation solution before it's launched, detailing the testing methodologies, test cases, and responsibilities. This foundational structure is vital to ensuring the quality and readiness of the solution from a technical standpoint.

Together, these outputs support a thorough and structured approach to the design and preparation for automation solutions